Thursday, October 25, 2012

Seattle VA Hospital 7th floor remodel

7th floor West Wing renovation which started June 2012.



Artwork painted by patients.



Then it was time to take down and save all the metal ceiling tiles so we could re-use many of them after the re-model.






Scaffolding for the trash shoot.


Then the DEMO!














I salvaged 4 metal cabinets and installed 2 of them in my wood shop and redesigned my tool box using the other two.


Strawberry Patch I built for my wife this summer.








Filled 80 holes with structure-lite.





Starting the "Quiet Room".



























No comments:

Post a Comment