Tuesday, August 11, 2009

St. Anthony's hospital - Gig Harbor, Wa - Nuses Stations

Operating Recovery room. I helped install a few sinks, Stanless steal kick plates and counter tops.

We had to install different Pulls for these full storage cabinets along the wall of the 2nd floor operating recovery area. That meant drilling a different who for each door and about 20 doors. So you can see the template I made on the door next to the opened door. Paul showed me a secret on how to cover up every whole on each door that was no longer needed too. It worked great.

I installed a few of the stainless steal kick plates in Nurses stations too, along with a few counter tops.

From the Ground floor to the 4th floor one of my jobs was to install every Pull on every drawer, counter and cabinet door. After which each of them had to be adjusted too. I couldn't really tell you how many there were. There were so many I didn't even bother counting.